Temporary supply
Temporary supply refers to any service consisting of setting up a temporary connection and the temporary supply of electricity for events, functions, or construction work.
The temporary supply of an electrical power source is granted for a period of 3 months or less, extendable if necessary.
Connection and disconnection fees depend on the nature of the supply, whether creating a new supply point or using an existing connection.
Upon receipt of your written request, we will schedule an on-site appointment to agree on the connection point. Please note that our services include:
- Connecting your metering and protection cabinet to the terminals of the public distribution network. This must first have received our technical approval.
- Providing power within the technical limits of this network.
- Supplying the energy.
Our services do not include the entire distribution installation located downstream of the network terminals, in particular the connection cable, the metering and protection cabinet, and the earth connection.